DumpExams is an authorized company offering valid and latest dump exams & dumps VCE materials. Our dump exams & dumps VCE materials are high-quality; our passing rate is higher than others.

Apr-2026 E_S4CON_2025 Study Material, Preparation Guide and PDF Download [Q22-Q38]

Share

Apr-2026 E_S4CON_2025 Study Material, Preparation Guide and PDF Download

Free E_S4CON_2025 Certification Sample Questions with Online Practice Test

NEW QUESTION # 22
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.

  • A. PARDIST_SHD
  • B. TABIM UPG
  • C. PARMVNT_UPG
  • D. TABIM_SHADOW_INC

Answer: B,C


NEW QUESTION # 23
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the Charts Control Ceenter in the SUM UL
  • B. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
  • C. Check the log files written in the SUM directory, subdirectory abap, subdirectory log
  • D. Check logs for jobs starting with RSUPG SGEN in the SAP system.

Answer: A,C


NEW QUESTION # 24
What do you need to consider when performing the SI checks for an SAP S/4HANA connversion? Note: There are 2 correct answers to this question.

  • A. The errors from the SI checks must be solved; otherwise, SUM will report an errror.
  • B. You need to build up an SI check framework by applying SAP Notes.
  • C. The Si checks are executed in the development system and the results are trannsported into the subsequent systems.
  • D. You need an SAP system baased on AS ABAP 7.52 or above for the SI check frammework.

Answer: A,B


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU CLONE MIG_DT_RUN
  • B. EU_CLONE MIG SOT RUN
  • C. EU IMPORT ALL
  • D. EU_CLONE MIG_DT_CREATTE

Answer: A


NEW QUESTION # 26
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?

  • A. The start of the business doowntime
  • B. The end of the database miigration
  • C. The start of the Execution roadmap step
  • D. The end of the business downtime

Answer: D


NEW QUESTION # 27
What is the benefit of using the UPGANAXML file from a previous SUM run?

  • A. To skip selected phases durring the SUM run
  • B. To make the progress information within SUM UI more accurate
  • C. To repeat specific phases during the SUM run
  • D. To auto-fill specific fields onn selected screens on the SUM UI

Answer: B


NEW QUESTION # 28
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • B. Import a transport request from the development system that contains the reccording of the activation.
  • C. Activate the required business functions manually in the production system.
  • D. During conversion, SUM deelivers some business functions already activated.

Answer: B,D


NEW QUESTION # 29
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?

  • A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • C. The SAP Support Packages that will be bound to the conversion
  • D. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner

Answer: A


NEW QUESTION # 30
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the main import
  • B. To optimize the activation
  • C. To optimize the conversion
  • D. To optimize the migration

Answer: D


NEW QUESTION # 31
How does SUM recognize modificattion adjustment transports from predecessor systemms?

  • A. By searching for transport requests named <sid>KO<number>
  • B. By searching for transport requests in file umodauto.lst
  • C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • D. By searching for transport requests that are assigned to project SAP ADJUST

Answer: B


NEW QUESTION # 32
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP S/4HANA Server 2022
  • B. SAP ECC system from SAP ERP 6.0 EHP 8
  • C. Standalone AS ABAP with SAP BASIS 752
  • D. SAP Solution Manager 7.2

Answer: A,C


NEW QUESTION # 33
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

  • A. Migration Hub
  • B. Central Instance
  • C. Transition Server
  • D. Migration Server

Answer: D


NEW QUESTION # 34
During a SUM run, you want to check if the PARCONV_UPG phase is still running propeerty. Where can you find information about thiss? Note: There are 2 correct answers to this question.

  • A. Check for running R3load processes on the host where SUM is running
  • B. Check the latest log files in the SUM directory, subdirectory abap, subdirectoryy tmp.
  • C. Check for running R3trans processes on the host where SUM is running
  • D. Check the running batch job via Job Overview (SM37).

Answer: B,D


NEW QUESTION # 35
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?

  • A. Run the database migrationn to the SAP HANA database.
  • B. Perform the migration of data to the new data structure.
  • C. Check the compatibility of custom code with SAP S/4HANA.
  • D. Solve problems from the si mplification item (SI) checks.

Answer: C


NEW QUESTION # 36
You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.

  • A. Use DMO for SUM.
  • B. Perform an SAP S/4HANA conversion without DMO.
  • C. Apply SAP Support Packagees.
  • D. Upgrade the SAP system.
  • E. Perform an SAP S/4HANA conversion including DMO.

Answer: A,C,D


NEW QUESTION # 37
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perfform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: B,C,E


NEW QUESTION # 38
......

E_S4CON_2025  Certification Study Guide Pass E_S4CON_2025 Fast: https://www.dumpexams.com/E_S4CON_2025-real-answers.html

E_S4CON_2025 Dumps PDF 2026 Program Your Preparation EXAM SUCCESS: https://drive.google.com/open?id=14wok6DL4nMFvaTrjl09PbHs7pLCIwK30