Which features apply to quota violations modeled with the optimizer?
- A. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.
- B. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
- C. Quotas can be modeled for sourcing location, production, and consensus demand.
- D. Min and Max Quotas have to be the same as sourcing ratios.
Answer: B
NEW QUESTION # 12
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. Configuration items should be bundled in the collections based on the SAP IBP project stream.
- B. You should delete collections after they have been transported.
- C. A planning area with the copy operators assigned must be bundled in one collection.
- D. A planning area with its time profile must be bundled in one collection.
Answer: C,D
NEW QUESTION # 13
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.
- A. Identify inventory items that require closer attention.
- B. Substitute missing values in case of sporadic demands.
- C. Choose time-independent key figures as segmentation measures.
- D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
Answer: A,C
NEW QUESTION # 14
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note:
There are 2 correct answers to this question.
- A. Changing the layout of the master data workbooks
- B. SAP IBP ribbon extension
- C. Changing the entries from the Name Manager
- D. Changing the member names
Answer: A,B
NEW QUESTION # 15
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. Key figures can be calculated across different planning levels.
- B. The calculation chain for a key figure must always result in a calculated key figure.
- C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- D. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
Answer: A,C
NEW QUESTION # 16
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note:
There are 3 correct answers to this question.
- A. Maximum lot size
- B. Transportation lead times
- C. Adjusted transport receipts
- D. Minimum lot size
- E. Aggregated constraints
Answer: A,B,C
NEW QUESTION # 17
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Maximum lot size
- B. Transportation lead times
- C. Adjusted transport receipts
- D. Minimum lot size
- E. Aggregated constraints
Answer: A,B,C
NEW QUESTION # 18
What are the S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery
- B. Number of fair share segments Additional tiering costs (default) Inventory days of supply
- C. Number of fair share segments Additional tiering costs (default) Maximum inventory
- D. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery
Answer: A
NEW QUESTION # 19
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
- B. Capacity leveling will be possible for production and storage resources.
- C. Excess stock can be generated and will need to be staged in an overflow warehouse.
- D. Minimum capacity utilization will result in pull production occurring.
Answer: A,C
NEW QUESTION # 20
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?
- A. Virtual Master Data Type
- B. External Master Data Type
- C. Reference Master Data Type
- D. Compound Master Data Type
Answer: C
NEW QUESTION # 21
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Scenario ID
- B. Key figure type
- C. Attributes
- D. Reason code
- E. Modified date
Answer: C,D,E
NEW QUESTION # 22
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.
- A. Decoupling Points determination in SAP IBP for demand-driven replenishment
- B. Supply Heuristics in SAP IBP for sales and operations
- C. Charts creation in SAP Supply Chain Control Tower
- D. Demand Sensing with Gradient Boosting (Full)
Answer: B,D
NEW QUESTION # 23
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a attribute as a key figure
- B. Using a local member
- C. Using a key figure calculation
- D. Using a appropriate period weight factor
Answer: D
NEW QUESTION # 24
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.
- A. Bias Detection and Correction in Sales History
- B. Substitute Missing with Mean or Median in Sales History
- C. Promotion Sales Lift Elimination
- D. Intermittency Detection and Correction in Sales History
Answer: B,C
NEW QUESTION # 25
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.
- A. Business Network in SAP Ariba
- B. Financial Planning in SAP Analytics Cloud
- C. Salesforce Sales Cloud
- D. User management in SAP Success Factors
Answer: A,B
NEW QUESTION # 26
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an integer and profiles by an alphanumeric prefix.
- B. Both periods and profiles have start and end dates.
- C. Periods are identified by an alphanumeric prefix and profiles by an integer.
- D. Both periods and profiles are identified by a unique integer.
Answer: A,C
NEW QUESTION # 27
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Create planning objects for new combinations in the app
- B. Enter the product family to which the new product belongs
- C. Copy the launch dimension from the reference product to the new product
- D. Enter the Phase-out Start Date and Phase-out End Date
Answer: A,C
NEW QUESTION # 28
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Inventory Optimization
- B. Demand Sensing
- C. Sales and Operations Planning
- D. Response Planning
- E. Demand Driven Replenishment
Answer: A,B,C
NEW QUESTION # 29
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- B. Planning view templates in the SAP IBP add-in for Microsoft Excel
- C. Supply chain graph in Supply Chain Network app
- D. Jobs in the Applications Jobs app
Answer: B,D
NEW QUESTION # 30
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
- A. Using Driver-Based planning
- B. Leveraging the functionality of SAP Workzone
- C. Using Microsoft Excel planning views
- D. Leveraging the web-based planning capability
Answer: C,D
NEW QUESTION # 31
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. You can only apply one value-based filter per planning view.
- C. These filters can be used together with attribute totals in the same planning view.
- D. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- E. These filters are always applied based on the values stored in the database.
Answer: B,D,E
NEW QUESTION # 32
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Set up a three-tier landscape using transport, starting from the development system to test and production.
- B. Create additional test planning areas in the production system to support cutover needs.
- C. Create additional planning areas in the test system to support training needs.
- D. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
Answer: A,D
NEW QUESTION # 33
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. A time profile has to be activated so that the application job can proceed.
- B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- C. The assigned Planning Area must be active.
- D. This application job can be run for multiple time profiles at once.
Answer: B
NEW QUESTION # 34
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This object provides a single value for a unique planning combination.
- B. This type of key figure is not usually stored and it cannot be set to editable.
- C. This object contains user-defined criteria that monitor the running of business plans.
- D. This object is not exposed to the user in planning views or modeling.
Answer: A
NEW QUESTION # 35
......
Sample Questions of C_IBP_2305 Dumps With 100% Exam Passing Guarantee: https://www.dumpexams.com/C_IBP_2305-real-answers.html
Correct Practice Tests of C_IBP_2305 Dumps with Practice Exam: https://drive.google.com/open?id=1XapaORvNOOlbO7I0718wuWfDWRBD_NmW