NEW QUESTION # 26
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Downtime Optimized DMO (DoDMO)
- B. Downtime Optimized Data Conversion (DoC)
- C. Near-Zero Downtime Maintenance (nZDM)
- D. Near-Zero Downtime Technology (NZDT)
Answer: D
NEW QUESTION # 27
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:
- A. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
- B. /ASU/START (Start ASU Toolbox)
- C. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
- D. /ASU/SSM (ASU Simple Schedule Manager)
Answer: B
NEW QUESTION # 28
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. An additional temporary database is used during uptime
- B. The repository is migrated in uptime
- C. Dedicated application tables are migrated in uptime
- D. TABIMJJPG is executed in uptime
Answer: C
NEW QUESTION # 29
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. Post-downtime
- B. During downtime
- C. During uptime
- D. During SPDD
Answer: A,C
NEW QUESTION # 30
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Move the SAPM update archive into the download folder
- B. Move the stack.xml update file into the download folder
- C. Extract the SAP HANA database installation archive
- D. Extract the SAP HANA client installation archive
- E. Move the R3trans update archive into the download folder
Answer: A,B,D
NEW QUESTION # 31
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Shadow on target creation
- B. Downtime migration
- C. Downtime conversion
- D. Silent data migration (SDM)
Answer: B
NEW QUESTION # 32
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:
- A. Check the "Charts Control Center" in the SUM UI
- B. Check the dump size of the database export on disk
- C. Check logs for jobs starting with "RSUPG_SGEN" in the system
- D. Check the log files written under "SUM\abap\log"
Answer: A,D
NEW QUESTION # 33
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- B. Unicode conversion Database migration SAP S/4HANA conversion without database migration
- C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
- D. SAP S/4HANA conversion including database migration and Unicode conversion
- E. Unicode conversion SAP S/4HANA conversion including database migration
Answer: B,C,E
NEW QUESTION # 34
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Please choose the correct answer.
Response:
- A. Credentials of user DDIC in client 000 of the shadow system
- B. Credentials of a named user in client 000 of the shadow system
- C. Credentials of a named user in the development client of the development system
- D. Credentials of user DDIC in the development client of the development system
Answer: B
NEW QUESTION # 35
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
Answer: B
NEW QUESTION # 36
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Uninstall industry extensions not supported by SAP S/4HANA
- D. Delete client 066 (Early Watch Client)
Answer: B,D
NEW QUESTION # 37
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
- A. Use DMO for SUM
- B. Upgrade the SAP system
- C. Perform an SAP S/4 HANA conversion without DMO
- D. Apply SAP support packages
- E. Perform an SAP S/4 HANA conversion including DMO
Answer: A,B,D
NEW QUESTION # 38
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the system log (transaction SM21) of the SAP system
- B. Check the messages shown by the SUM UI
- C. Check the most recent entries in SAPup.log
- D. Check the most recent entries shown in file sapevt.trc
Answer: B,C
NEW QUESTION # 39
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for source release, Windows, SAP MaxDB
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for target release, Linux, SAP HANA
- D. Kernel for target release, Windows, SAP HANA
Answer: A,D
NEW QUESTION # 40
ICNV initialization does 3
- A. Build index on flag column
- B. AA
- C. Creation of flag
- D. Creation of views
Answer: A,C,D
NEW QUESTION # 41
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Conversion
- B. Migration
- C. Main import
- D. Software update
Answer: A,B
NEW QUESTION # 42
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 43
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An upgrade of the software components is performed, without changing the database type.
- B. An SAP S/4HANA conversion is performed, without adapting the customer data.
- C. A change of the database type is performed, without changing the software components.
- D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
Answer: C
NEW QUESTION # 44
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To make the progress information within SUM UI more accurate
- B. To skip selected phases during the SUM run
- C. To repeat specific phases during the SUM run
- D. To auto-fill specific fields on selected screens on the SUM UI
Answer: A
NEW QUESTION # 45
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Software update
- B. Custom code analysis
- C. Database migration
- D. Unicode conversion
Answer: A,C
NEW QUESTION # 46
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Before the downtime starts
- B. Early in the downtime
- C. As part of the cleanup process
- D. At the end of the downtime
Answer: A