NEW QUESTION # 365
一名團隊成員在每日站立會議上總是遲到。專案經理該做什麼?

  • A. 忽略這種情況,因為團隊成員正在完成他們的可交付成果。
  • B. 直接與團隊成員交談以強化基本規則。
  • C. 將會議安排在一天結束時以容納所有人。
  • D. 強化與整個團隊舉行站立會議的基本規則。

Answer: B

Explanation:
Explanation
According to the Project Management Professional (PMP) Reference Materials, the project manager should speak with the team member directly to reinforce the ground rules when one of the team members is always late to the daily standup meeting. This is because the daily standup meeting is a crucial tool for agile teams to synchronize their work, share progress, identify impediments, and collaborate effectively. The daily standup meeting requires the participation and commitment of all team members, and it should be held at the same time every day. If a team member is consistently late to the meeting, it can disrupt the flow of the meeting, affect the morale of the team, and reduce the value of the meeting. Therefore, the project manager should address the issue with the team member individually, and remind them of the importance and expectations of the daily standup meeting. The project manager should also try to understand the reasons for the team member's tardiness, and offer support or solutions if needed. The project manager should avoid blaming or shaming the team member, and instead focus on the positive outcomes of attending the meeting on time. By speaking with the team member directly, the project manager can resolve the issue in a respectful andconstructive way, and improve the team's performance and satisfaction. References: Project Management Professional (PMP) Exam Content Outline, A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Seventh Edition, Daily Standup Meetings: Everything You Should Know, [Is Your Coworker Always Late to Meetings? What To Do].


NEW QUESTION # 366
一家大型跨國公司在新興經濟體國家開展一個項目。所有業務事宜均以當地貨幣進行。在項目過程中,由於該國貨幣不穩定,預算成為首要問題。
項目經理接下來應該做什麼?

  • A. 向客戶要求額外預算
  • B. 使用項目的應急儲備
  • C. 與團隊一起評估情況
  • D. 將風險升級給項目發起人

Answer: B


NEW QUESTION # 367
專案經理正在處理一個全球專案。一名團隊成員來自不同國家,無法定期參加專案會議。因此,其他團隊成員開始質疑專案會議的必要性。這個問題正在影響交付時間和品質參數。
專案經理應該如何管理專案可交付成果?

  • A. 強制所有成員參加所有專案會議。
  • B. 定義專案會議的規則。
  • C. 定義專案會議的議程。
  • D. 強制所有成員在專案會議上討論他們的工作。

Answer: C

Explanation:
Explanation
According to the PMBOK Guide, one of the tools and techniques for managing project communications is meeting management. This involves planning, conducting, and following up on project meetings. One of the inputs for meeting management is the meeting agenda, which is a document that lists the topics to be discussed, the objectives of the meeting, the roles and responsibilities of the participants, and the time allocated for each topic. A well-defined meeting agenda can help the project manager to manage the project deliverables by ensuring that the meeting is focused, productive, and relevant to the project objectives. It can also help to address the concerns of the team members who question the need for the project meeting, by showing them the value and purpose of the meeting. A meeting agenda can also facilitate the participation and engagement of the team members who are unable to attend the meeting regularly, by allowing them to prepare in advance, provide feedback, or delegate their tasks to others. References: PMBOK Guide, Sixth Edition, pages 377-378. PMP Exam Prep Coursebook, page 287. PMP Exam Strategy Guide, page 25.


NEW QUESTION # 368
在專案結束階段,專案經理發現客戶沒有使用某項特定服務。然後,客戶非正式地要求專案經理將服務延長到合約結束日期之後。合約中明確規定了服務期限。
專案經理應該如何解決這種情況才能結束專案?

  • A. 接受客戶使用該服務的建議,直到額外的時間用完。
  • B. 拒絕請求並將其包含在下次合約續約的經驗教訓文件中。
  • C. 發出變更請求並啟動正式的變更控制流程來解決此情況。
  • D. 將請求回報給職能經理以批准額外的服務時間。

Answer: C


NEW QUESTION # 369
一個團隊已經工作了兩個月,但始終未能完成計劃的使用者故事。專案經理應該如何解決這個問題?

  • A. 促進更改迭代持續時間,以便按計劃提交。
  • B. 確保衝刺大小適合迭代持續時間。
  • C. 招募高技能資源來強化技能。
  • D. 考慮使用獎勵系統來鼓勵及時交付。

Answer: B

Explanation:
Explanation
= The project manager should ensure the sprint size is appropriate for the iteration duration. This means that the team should be able to complete the user stories within the timebox of the sprint, without compromising the quality or scope of the deliverables. If the team is consistently missing planned user stories, it may indicate that the sprint size is too large or the iteration duration is too short. The project manager should work with the team and the product owner toadjust the sprint size and the product backlog accordingly, based on the team's velocity and capacity12. References: = PMBOK Guide 7th Edition, Chapter 5: Delivery Performance, Section
5.2.3: Plan and Manage Iterations; PMBOK Guide 6th Edition, Chapter 6: Project Schedule Management, Section 6.2.2.5: Agile Release Planning.


NEW QUESTION # 370
專案經理正在與不同國家的團隊成員一起檢視一個大型專案的狀態。通過狀態審核。專案經理注意到一個團隊始終落後於計劃,他們的工作經常需要糾正。
專案經理應該怎麼做才能提升團隊的工作品質?

  • A. 與專案發起人一起檢視問題,並努力縮小該團隊的範圍。
  • B. 指導所有團隊成員並引入外部顧問來完成工作。
  • C. 請當地主題專家 (SME) 協助團隊檢視專案要求。
  • D. 與團隊一起評估問題,以確定他們是否具備執行任務所需的技能。

Answer: D


NEW QUESTION # 371
一家醫院正在為其內部關鍵系統之一運行一個項目,以管理計費患者數據和記錄管理以及諮詢報告和醫生的輸入項目經理現在需要對已識別的風險進行分類將左側的每個風險類型拖至其正確的示例在右側

Answer:

Explanation:


NEW QUESTION # 372
敏捷專案中測試團隊的成員與專案團隊合作良好。然而,在前兩次迭代中,該團隊成員的表現很差,團隊很難達到迭代目標。
專案經理該如何處理這種情況?

  • A. 將此問題通知人力資源 (HR) 部門。
  • B. 與團隊成員的職能經理討論此問題。
  • C. 允許專案團隊與該團隊成員討論問題。
  • D. 與團隊成員討論提升績效的必要性。

Answer: C


NEW QUESTION # 373
專案經理負責建造一座橋樑。項目的高階元素是使用預測方法來處理的。負責收回橋樑的軟體是根據敏捷原則開發的。在軟體開發過程中,由於缺乏訊息,工作流程經常會因各種延遲或障礙而中斷。
專案經理該如何處理這種情況?

  • A. 增加回顧以快速交付結果。
  • B. 使用看板讓工作可見。
  • C. 應用精實製造來限制團隊的工作。
  • D. 將小批量工作合併到專案中。

Answer: B


NEW QUESTION # 374
專案經理正在進行一個跨國內外部門的企業資源規劃 (ERP) 實施專案。專案經理了解門審和定期檢查的重要性。
專案經理應該利用下列哪一項?

  • A. 專案管理計劃
  • B. 專案管理辦公室(PMO)
  • C. 治理框架
  • D. 整合計劃

Answer: C

Explanation:
Explanation
According to the PMBOK Guide, a governance framework is a set of structures, processes, guidelines, and policies that provide guidance, oversight, and direction for project, program, and portfolio management. A governance framework helps to ensure that the projects are aligned with the organizational strategy, objectives, and values, and that they deliver the expected benefits and value to the stakeholders. A governance framework also helps to monitor and control the project performance, quality, risks, and changes, and to support the decision-making and problem-solving processes.
In this question, the project manager is working on an ERP implementation project that spans divisions within and outside the country. This implies that the project is complex, large-scale, and involves multiple stakeholders and requirements. The project manager understands the importance of gate reviews and periodic checks, which are part of the governance framework. Gate reviews are checkpoints that determine whether the project can proceed to the next phase or stage, based on the completion of the required processes and tasks, and the assessment of the project feasibility, viability, and desirability. Periodic checks are reviews that evaluate the project progress and status, and identify and resolve any issues, risks, or changes that may affect the project objectives and outcomes. The project manager should leverage the governance framework to ensure that the project is managed effectively and efficiently, and that it meets the stakeholder expectations and needs.
The other options are not correct because they do not provide a valid answer to the question. Option A is wrong because it refers to the project management office (PMO), which is an organizational structure that provides support, guidance, and governance for project, program, and portfolio management. The PMO is not the same as the governance framework, although it may be involved in implementing or enhancing the governance framework. Option B is wrong because it refers to the integration plan, which is a component of the project management plan that describes how the project activities and processes will be coordinated and integrated. The integration plan is not the same as the governance framework, although it may be influenced by the governance framework. Option C is wrong because it refers to the project management plan, which is a document that defines the scope, objectives, and approach of the project, and how the project will be executed, monitored, and controlled. The projectmanagement plan is not the same as the governance framework, although it may be aligned with the governance framework. References:
PMBOK Guide, 6th edition, pages 34-35, 513-514, 540-541
Project governance - Project Management Institute
Governance of Portfolios, Programs, and Projects | PMI
What is Project Governance? Components, Frameworks, Examples - KnowledgeHut Project Management Governance - Complete Guide Governance | PMI - Project Management Institute


NEW QUESTION # 375
專案經理正在處理一個需要增量交付價值的專案。專案經理應採取哪些行動才能成功執行專案?

  • A. 與專案發起人合作以了解範圍。
  • B. 確定有形和無形的好處。
  • C. 建立包含里程碑的專案進度表。
  • D. 制定一套全面的要求。

Answer: C


NEW QUESTION # 376
一家公司正在從預測方法過渡到敏捷方法。團隊成員遠距工作,有些人存在個人衝突,導致無法參加某些專案儀式。產品負責人明確表示,議程非常緊張,團隊必須盡力參加所有儀式。
身為僕人式領導者,專案經理該如何應對這種情況?

  • A. 請團隊成員集體決定如何支援團隊。
  • B. 評估替代選項並嘗試尋找具有類似技能的資源。
  • C. 與這些團隊成員一起參加單獨的儀式,讓他們繼續參與專案。
  • D. 在沒有團隊成員的情況下執行儀式並透過電子郵件向他們發送註釋。

Answer: A

Explanation:
Explanation
= The project manager, as a servant leader, should ask the team members to decide collectively on how to support the team. This is because the team members are the best people to know their own availability, preferences, and constraints. The project manager should facilitate a collaborative discussion among the team members to find a solution that works for everyone and respects the agile principles and values. The project manager should also empower the team members to self-organize and take ownership of their work and commitments.
Option B is not a good action, as engaging in separate ceremonies with these team members may create inconsistency, confusion, and duplication of work. It may also reduce the transparency, communication, and feedback that are essential for agile projects. The project manager should try to ensure that all team members participate in the same ceremonies and follow the same process.
Option C is not a good action, as evaluating alternative options and trying to find resources with similar skills may not be feasible or desirable. It may also create additional costs, risks, and delays for the project. The project manager should try to retain the existing team members and leverage their skills and knowledge. The project manager should also respect the team members' personal conflicts and not force them to leave the project.
Option D is not a good action, as performing the ceremonies without the team members and sending them notes by email may not be effective or efficient. It may also create a sense of exclusion, isolation, and disengagement among the team members. The project manager should try to ensure that all team members are actively involved and engaged in the ceremonies and the project. The project manager should also use interactive and synchronous communication tools and techniques to foster collaboration and alignment among the team members. References:
[PMBOK Guide], 6th edition, page 52, section 3.1.4
[Agile Practice Guide], page 14, section 1.3.2
[PMP Exam Content Outline], page 11, task 1 under domain 3


NEW QUESTION # 377
一個專案正在進行六次迭代中的第四次。在迭代計劃期間,團隊成員通知專案經理他們的電腦無法運作。
專案經理接下來該做什麼?

  • A. 請其他團隊成員介入並完成工作。
  • B. 幫助 IT 部門優先解決問題。
  • C. 建議團隊成員聯絡 IT 部門。
  • D. 更新問題日誌並將問題回報給產品擁有者。

Answer: B


NEW QUESTION # 378
項目經理計劃與客戶會面,召開每周風險管理會議。項目經理觀察到,其中一項具有外部依賴性的任務延遲了一周。項目經理知道這會產生影響,但不知道確切的細節。
項目經理應該做哪兩件事?(選擇兩項)

  • A. 等待客戶提出疑慮並收集更多信息。
  • B. 與外部供應商主管部門討論該問題。
  • C. 收集附加信息並估計影響。
  • D. 回顧過去類似項目的經驗教訓。
  • E. 更新風險日誌並在與客戶的會議中提出該問題。

Answer: C,E


NEW QUESTION # 379
專案經理在混合專案中擔任 Scrum Master,並處理團隊成員之間的衝突。
應該用什麼策略來處理這個衝突?

  • A. 將衝突分為幾類:結構性衝突與人際衝突
  • B. 將衝突分為兩組:正面和負面
  • C. 在每日 Scrum 期間檢查衝突,以便及時處理
  • D. 將衝突放在共用衝突清單中並確保其可見

Answer: B


NEW QUESTION # 380
一些關鍵團隊成員最近離開了專案團隊。剩下的成員花了一些時間來了解細節,發現很難有進展。導致工程進度嚴重延誤。
專案經理該做什麼?

  • A. 觀察專案團隊並在升級之前給他們時間跟進。
  • B. 上報給專案發起人並尋求解決問題的替代方案。
  • C. 請求將更多資源納入專案團隊。
  • D. 審查問題並調整專案計劃以給出切合實際的時間表。

Answer: C

Explanation:
Explanation
According to the Project Management Professional (PMP) Reference Materials, the project manager should request additional resources to be incorporated to the project team when a few key team members recently left the project team, and the remaining members took time to understand the details and found it difficult to make progress, resulting in a serious delay in the project schedule. This is because the project manager needs to ensure that the project has sufficient resources to complete the work within the agreed time, cost, and quality constraints. By requesting additional resources, the project manager can fill the gaps left by the departed team members, and provide the necessary skills, expertise, and experience to the project. The project manager can also use the additional resources to accelerate the work, reduce the learning curve, and mitigate the risks associated with the team turnover. Requesting additional resources can help the project manager to recover from the setback, and deliver the project successfully. References: Project Management Professional (PMP) Exam Content Outline, A Guide to the Project Management Body of Knowledge (PMBOK Guide) - Seventh Edition, How To Handle A Key Team Member Leaving At A Critical Project Point.


NEW QUESTION # 381
專案經理在矩陣組織中工作,正在管理一個內部軟體開發項目,該項目旨在減少公司內部追蹤系統中的衝突。在開發過程中,專案經理被告知軟體必須考慮政府會計要求的意外變更。開發團隊無需額外成本即可進行更改;然而,專案經理注意到測試成本開始超出測試預算。
專案經理該做什麼?

  • A. 更新估算基礎和成本管理計劃,以追蹤測試所需的額外資金。
  • B. 透過治理流程向成本基準提交變更請求,為額外的測試提供資金。
  • C. 請專案發起人從緊急儲備中撥出資金來資助額外的測試。
  • D. 進行成本效益分析,以確定是否可以從開發團隊重新分配資金。

Answer: B


NEW QUESTION # 382
一位新的專案經理正在為軟體開發公司製定時間敏感的社群媒體策略,該公司正在為利害關係人制定溝通管理計劃。
這是該公司轉為全職遠距工作以來的第一個重大項目。
在審查了所有先前的公司工件後,專案經理找到了一份標準作業程序 (SOP) 文檔,概述了所有溝通應如何進行。
專案經理應該如何進行?

  • A. 使用 SOP 作為基本計劃,並在專案的控制和監控階段進行更新。
  • B. 忽略 SOP 並為此專案編寫單獨的溝通管理計畫。
  • C. 遵守專案的 SOP,記下所需的更改,並上報給變更管理委員會。
  • D. 評估 SOP 的相關性,進行更新,並在專案規劃期間分發給利害關係人以徵求意見。

Answer: D


NEW QUESTION # 383
一位經驗豐富的專案經理正在管理一個價值數百萬美元的敏捷專案。專案經理向團隊傳達基本規則,但經過 12 次迭代後,專案經理開始注意到一些團隊成員沒有遵守基本規則。
為了確保團隊遵守基本規則,專案經理首先該做什麼?

  • A. 將此行為通知專案發起人並要求發起人採取紀律處分。
  • B. 安排與專案團隊的會議以強化基本規則。
  • C. 聯絡人力資源部門,要求向不遵守基本規則的團隊成員發送書面警告信。
  • D. 請職能經理更換不遵守基本規則的團隊成員。

Answer: B


NEW QUESTION # 384
項目經理正在使用敏捷方法為石油和天然氣客戶開發軟件開發項目。由於項目存在各種未知因素,項目經理在準備進度表時遇到了困難。
項目經理應該使用哪種調度方法來製定進度表?

  • A. 三點調度
  • B. 迭代調度
  • C. 類比調度
  • D. 參數化調度

Answer: B


NEW QUESTION # 385
一名新專案經理被指派負責兩週前開始的正在進行的敏捷創新專案。在審查專案後,新專案經理發現前專案經理正計劃使用預測方法。前專案經理計劃在 8 個月內專案完全完成時向客戶展示第一個主要交付成果。
新的專案經理該做什麼?

  • A. 向專案委員會提交變更請求,將交付日期調整為比計畫提早2個月。
  • B. 使用混合方法,其中使用敏捷實踐,但在專案結束時向客戶提供價值。
  • C. 與團隊會面,審查待辦事項並創建可以為客戶提供增量價值的小型迭代。
  • D. 繼續使用預測方法在專案結束時交付價值。

Answer: C

Explanation:
Explanation
According to the PMBOK Guide, 6th edition, an agile innovation project is a project that uses an agile approach to deliver innovative products, services, or results that meet the changing needs and expectations of the customers and stakeholders. An agile approach is a way of managing a project that delivers value in short iterations, encourages collaboration and feedback, and embraces change and uncertainty. A predictive approach is a way of managing a project that follows a detailed plan, defines the scope and requirements upfront, and minimizes changes and risks. In this question, the new project manager is assigned to an ongoing agile innovation project that started 2 weeks ago. The new project manager discovered that the previous project manager was planning to use a predictive approach, which is not suitable for an agile innovation project. The previous project manager also planned to present the first major deliverable to the client when the project was completely finished in 8 months, which is not consistent with the agile principle of delivering value early and often. The question asks what the new project manager should do in this situation.
Based on this information, the best answer is option A, which is to meet with the team to review the backlog and create small iterations that can deliver incremental value to the client. This is because meeting with the team to review the backlog and create small iterations is an agile practice that can help the new project manager to align the project with the agile approach and the customer needs. The backlog is a list of features, functions, requirements, enhancements, and fixes that deliver value to the customer. The iterations are fixed time periods, usually between one and four weeks, in which the team completes a set of backlog items and produces a potentially releasable product increment. Meeting with the team to review the backlog and create small iterations can help the new project manager to understand the project vision, scope, and priorities, as well as to plan and execute the project work in an agile manner. Meeting with the team to review the backlog and create small iterations can also help the new project manager to deliver incremental value to the client, as well as to obtain feedback and validation from the client and other stakeholders.
Option B, which is to continue working with the predictive approach to deliver the value at the end of the project, is not a good answer. This is because continuing working with the predictive approach may not be effective or efficient for an agile innovation project, as it may not be able to cope with the changing needs and expectations of the customer and stakeholders. Continuing working with the predictive approach may also result in delivering a product that does not meet the customer requirements or satisfaction, as well as wasting time and resources on unnecessary or irrelevant features or functions.Continuing working with the predictive approach may also contradict the agile values and principles, such as responding to change over following a plan, and delivering working software frequently.
Option C, which is to use a hybrid approach in which agile practices are used but the value is provided to the client at the end of the project, is not a good answer. This is because using a hybrid approach may not be appropriate or beneficial for an agile innovation project, as it may not fully leverage the advantages of the agile approach, such as delivering value early and often, and obtaining feedback and validation from the customer and stakeholders. Using a hybrid approach may also create confusion and inconsistency among the project team, the customer, and other stakeholders, as they may have different expectations and perceptions of the project scope, schedule, quality, and risks. Using a hybrid approach may also compromise the agile values and principles, such as satisfying the customer through early and continuous delivery of valuable software, and collaborating with the customer throughout the project.
Option D, which is to submit a change request to the project board to adjust the delivery date to 2 months earlier than planned, is not a good answer. This is because submitting a change request to the project board may not be necessary or effective for an agile innovation project, as it may not address the root cause of the problem, which is the mismatch between the project approach and the project type. Submitting a change request to the project board may also introduce additional risks and challenges to the project, such as scope creep, quality issues, stakeholder resistance, and team burnout. Submitting a change request to the project board may also violate the agile values and principles, such as welcoming changing requirements, and delivering working software frequently. References: PMBOK Guide, 6th edition, Chapter 1: Introduction1; Chapter 4: Project Integration Management2; Chapter 5: Project Scope Management3; PMI, 2023, PMP Exam Content Outline, Domain II: Process, Task 1: Execute project with the urgency required to deliver business value.


NEW QUESTION # 386
......